Under the project of infrastructure construction of Rach Mieu residential area, Phan Xich Long is an important infrastructure project.
Project location
199 Dien Bien Phu St., Binh Thanh Dist. Ho Chi Minh
Project scale
Construction area is 11.000m2, 2 basements and 13 floors
Type
Office building
Project scope
Underground construction, rough and finishing
Number of floors
2 basements and 11 floors for office
|
Considered as the central axis of the project, Phan Xich Long street is 680m long from the point of intersection with Phan Dang Luu street to the border adjacent to the Mieu Noi residential area. Road design with a 35m width of 4 lanes. 8m wide is a place to grow flowers, trees to create a highlight for the road. 6 m wide side walkway is a pedestrian walkway.
Today, Phan Xich Long street is one of the busiest commercial streets of Phu Nhuan district with many office buildings, banks, eating places, restaurants and luxury.